Linear Construction
CJSC Stroytransgaz is active in over 40 regions of Russia. We can carry out a full range of work in construction, testing and repairs of pipelines with a length of up to 1,000 km a year. The company’s reference list includes all of Russia’s strategic pipeline projects, including East Siberia-Pacific Ocean (ESPO) oil pipeline system, Baltic Pipeline System-2 (BPS-2), Bovanenkovo-Ukhta gas pipeline system on Yamal, Ukhta-Torzhok trunk gas pipeline, and Sakhalin – Khabarovsk – Vladivostok gas pipeline.
Ongoing Projects
Completed Projects
Execution
Schedule |
Project
/ Investor |
Customer | Contract details |
2014 | Krasnoyarsk-Irkutsk oil pipeline / Transneft | Vostoknefteprovod LLC |
General contract for construction of two sections of Krasnoyarsk-Irkutsk trunk oil pipeline at the 15,2 km long section of Nizhneudinsk-Tulun pipeline. Pipe diameter:1000 mm. |
2014 | Standby connector between Tayshet pump station and Tayshet main pump station of ESPO | Vostoknefteprovod LLC |
Construction of 2,2 km long standby connector between Tayshet pump station and Tayshet main pump station of ESPO. Pipe diameter: 1000 mm. |
2015-2016 | Trunk gas pipeline «South-European gas pipeline. «Pochinki-Anapa» part / Gazprom | Gazprominvest LLC |
General contract for construction of a part of trunk gas pipeline «South-European gas pipeline. «Pochinki-Anapa», 834 km – 978 km with the whole length of 144 km. Pipe diameter:1400 mm. |
2014-2016 | Trunk gas pipeline «South-European gas pipeline. «Pochinki-Anapa» part / Gazprom | Gazprominvest LLC |
General contract for construction of a part of trunk gas pipeline «South-European gas pipeline. «Pochinki-Anapa», 978 km – 1231 km with the whole length of 253 km. Pipe diameter:1400 mm. |
2013 | Railway yard of 12-17 line. Railway reconstruction №№ 12,13, Surgut branch of Gazpromtrans LLC / Gazprom | PPC Promstroyput LLC |
Temporary road construction for tank-cars maintenance at the Promishlennaya station. Setting-up of temporary road electrical system.
Railways construction
|
2012-2014 | NGL main pipeline from the Purovsky Gas Condensate Processing Plant to Tobolsk-Neftekhim / SIBUR | SiburTyumenGaz |
General contract for construction of sections with a total length of 260.4 km on the track ‘South Balykskaya head pumping station - Tobolsk-Neftekhim’ including underwater crossing Demyanka and Turtas rivers and related infrastructure; pipe diameter: 700 mm More about the project |
2012 | Gryazovets–Vyborg gas pipeline (second line) / Gazprom | Gazpromstroyinvest |
Construction of a 21.8 km section; pipe diameter: 1420 mm |
2014-2015 | Trunk gas pipeline «South-European gas pipeline. «Pochinki-Anapa» part / Gazprom | Gazprominvest LLC |
General contract for construction of a part of trunk gas pipeline «South-European gas pipeline. «Pochinki-Anapa», 1379 km – 1570,5 km with the whole length of 191,5 km. Pipe diameter:1400 mm. |
2011-2012 | Ukhta-Torzhok gas pipeline / Gazprom | Stroygazconsulting |
Full scope of works on a section 185 km in length; pipe diameter: 1420 mm; wall thickness: 21.6-32 mm More about the project |
2011 | Sakhalin–Khabarovsk–Vladivostok gas pipeline / Gazprom | DJSC Spetsgazavtotrans JSC Gazprom |
Assembly and welding works on sections with a total length of 6.6 km (gas pipeline to the city of Vladivostok); pipe diameter: 1020 mm; wall thickness: 10.3-12.3 mm More about the project |
2013-2016 | Kuyumba-Tayshet trunk oil pipeline / Transneft | PMC ESPO LLC |
General contract for construction of 174,3 km long two sections of trunk oil pipeline. Pipe diameter:700 mm. More about the project |
2013-2015 | Gas transmission system to deliver gas from North Caspian gas fields / LUKOIL | LUKOIL-Nizhnevolzhskneft |
Construction of a 263.3 km long gas pipeline (‘Landfall – Stavrolen LLC‘), including all related infrastructure; pipe diameter: 700 mm More about the project |
2011 | Sakhalin–Khabarovsk–Vladivostok gas pipeline / Gazprom | Stroygazconsulting |
Range of works in construction of junction points to compressor stations, construction of valve stations; pipe diameter: 15-1420 mm More about the project |
2013-2016 | Oil and gas transmission system from Yarudeyskoye field / NOVATEK | Yargeo |
General contract for construction of a 43.2 km long section of an oil pipeline; pipe diameter: 377 mm (project ‘Section 107.4–150.6 km of the Yarudeyskoye field – Purpe pump station oil pipeline’); construction of a 42 km long section of a gas pipeline; pipe diameter: 420 mm (project ‘Section 107–149 km of the Yarudeyskoye field – Nadymskaya compressor station gas pipeline’); underwater passages over the Kheygiyakha river; all related infrastructure More about the project |
2010-2012 | ESPO-2 oil pipeline / Transneft | Stroynovatsiya |
Assembly and welding works on sections with a total length of 15 km; pipe diameter: 1067 mm; wall thickness: 14 mm More about the project |
2010-2012 | ESPO-2 oil pipeline / Transneft | MRTS |
Full scope of works on multiple sections with a total length of 11 km, including the subsea tunnel via Amur River; pipe diameter: 1020 mm; wall thickness: 14 mm More about the project |
2012-2015 | Bovanenkovo - Ukhta gas pipeline (second stage) / Gazprom | Yamalgazinvest |
General contract for construction of sections with a total length of 249 km including underwater crossing Pechora, Big Synya and White rivers, and related infrastructure; pipe diameter: 1420 mm; wall thickness: 22.7-33 mm More about the project |
2010-2012 | ESPO-2 oil pipeline / Transneft | APMK-23 |
Assembly and welding works on sections with a total length of 67 km; pipe diameter: 1067 mm; wall thickness: 12 mm |
2009-2011 | BPS-2 / Transneft | Neftegazstroy, Tatnefteprovodstroy, SMU Truboprovodstroy |
Assembly and welding works on sections with a total length of 30 km; pipe diameter: 1020 mm; wall thickness: 11 mm More about the project |
2009-2010 | Bovanenkovo - Ukhta gas pipeline / Gazprom | Centrgaz-truboprovodstroy OJSC, Stroyinvest Komi CJSC |
Assembly and welding works on sections with a total length of 7,6 km; pipe diameter – 1420 mm; wall thickness – 27 mm More about the project |
2009 | Middle Asia - Center gas pipeline (Turkmen section) / GK Turkmengaz | OJSC Stroytransgaz |
Assembly and welding works on sections with a total length of 19.3 km; pipe diameter: 1420 mm; wall thickness: 15.7 mm |
2008 | Middle Asia - Center gas pipeline (Uzbek section) / Uzbekneftegaz petrochemical complex | Zeromax GmbH |
Assembly and welding works on sections with a total length of 16 km; pipe diameter: 1420 mm; wall thickness: 15.7 mm |
2008 | Uzbekistan - China gas pipeline / Uzbekneftegaz petrochemical complex | Zeromax GmbH |
Assembly and welding works on sections with a total length of 52 km; pipe diameter: 1067 mm; wall thickness: 19 mm |
2007-2009 | ESPO-1 oil pipeline / Transneft | KSTG-Vostok, OJSC Stroytransgaz, Omskneftegazspetsstroy, etc. |
Assembly and welding works on sections with a total length of 34.8 km; pipe diameter: 1220 mm; wall thickness: 19-24 mm More about the project |