Linear Construction

CJSC Stroytransgaz is active in over 40 regions of Russia. We can carry out a full range of work in construction, testing and repairs of pipelines with a length of up to 1,000 km a year. The company’s reference list includes all of Russia’s strategic pipeline projects, including East Siberia-Pacific Ocean (ESPO) oil pipeline system, Baltic Pipeline System-2 (BPS-2), Bovanenkovo-Ukhta gas pipeline system on Yamal, Ukhta-Torzhok trunk gas pipeline, and Sakhalin – Khabarovsk – Vladivostok gas pipeline.

 

Ongoing Projects

Execution
Schedule
Project
/ Investor
Customer Contract details




2014-2016 Power of Siberia gas transmission system / Gazprom Gazprom dobycha Noyabrsk Performing of the complex works on construction of the berth for heavy and constructional cargoes on the river Lena, located in the village Peleduy, Lensky district of Yakutia. General contract for the construction of 152.75 km of road from Chayanda to Talakanskoye field which develops JSC Surgutneftgaz. Within the project will be built 10 bridges, 218 km of winter roads, access roads to the four quarries, temporary buildings and structures.
2014-2015 Power of Siberia gas transmission system / Gazprom Gazprom transgaz Tomsk General contract for the preparatory stage of work


Completed Projects

Execution
Schedule
Project
/ Investor
Customer Contract details
2014 Krasnoyarsk-Irkutsk oil pipeline / Transneft Vostoknefteprovod LLC General contract for construction of two sections of Krasnoyarsk-Irkutsk trunk oil pipeline at the 15,2 km long section of Nizhneudinsk-Tulun pipeline. Pipe diameter:1000 mm.
2014 Standby connector between Tayshet pump station and Tayshet main pump station of ESPO Vostoknefteprovod LLC Construction of 2,2 km long standby connector between Tayshet pump station and Tayshet main pump station of ESPO. Pipe diameter: 1000 mm.
2015-2016 Trunk gas pipeline «South-European gas pipeline. «Pochinki-Anapa» part / Gazprom Gazprominvest LLC General contract for construction of a part of trunk gas pipeline «South-European gas pipeline. «Pochinki-Anapa», 834 km – 978 km with the whole length of 144 km. Pipe diameter:1400 mm.
2014-2016 Trunk gas pipeline «South-European gas pipeline. «Pochinki-Anapa» part / Gazprom Gazprominvest LLC General contract for construction of a part of trunk gas pipeline «South-European gas pipeline. «Pochinki-Anapa», 978 km – 1231 km with the whole length of 253 km. Pipe diameter:1400 mm.
2013 Railway yard of 12-17 line. Railway reconstruction №№ 12,13, Surgut branch of Gazpromtrans LLC / Gazprom PPC Promstroyput LLC Temporary road construction for tank-cars maintenance at the Promishlennaya station. Setting-up of temporary road electrical system. Railways construction
2012-2014 NGL main pipeline from the Purovsky Gas Condensate Processing Plant to Tobolsk-Neftekhim / SIBUR SiburTyumenGaz General contract for construction of sections with a total length of 260.4 km on the track ‘South Balykskaya head pumping station - Tobolsk-Neftekhim’ including underwater crossing Demyanka and Turtas rivers and related infrastructure; pipe diameter: 700 mm
More about the project
2012 Gryazovets–Vyborg gas pipeline (second line) / Gazprom Gazpromstroyinvest Construction of a 21.8 km section; pipe diameter: 1420 mm
2014-2015 Trunk gas pipeline «South-European gas pipeline. «Pochinki-Anapa» part / Gazprom Gazprominvest LLC General contract for construction of a part of trunk gas pipeline «South-European gas pipeline. «Pochinki-Anapa», 1379 km – 1570,5 km with the whole length of 191,5 km. Pipe diameter:1400 mm.
2011-2012 Ukhta-Torzhok gas pipeline / Gazprom Stroygazconsulting Full scope of works on a section 185 km in length; pipe diameter: 1420 mm; wall thickness: 21.6-32 mm
More about the project
2011 Sakhalin–Khabarovsk–Vladivostok gas pipeline / Gazprom DJSC Spetsgazavtotrans JSC Gazprom Assembly and welding works on sections with a total length of 6.6 km (gas pipeline to the city of Vladivostok); pipe diameter: 1020 mm; wall thickness: 10.3-12.3 mm
More about the project
2013-2016 Kuyumba-Tayshet trunk oil pipeline / Transneft PMC ESPO LLC General contract for construction of 174,3 km long two sections of trunk oil pipeline. Pipe diameter:700 mm.
More about the project
2013-2015 Gas transmission system to deliver gas from North Caspian gas fields / LUKOIL LUKOIL-Nizhnevolzhskneft Construction of a 263.3 km long gas pipeline (‘Landfall – Stavrolen LLC‘), including all related infrastructure; pipe diameter: 700 mm
More about the project
2011 Sakhalin–Khabarovsk–Vladivostok gas pipeline / Gazprom Stroygazconsulting Range of works in construction of junction points to compressor stations, construction of valve stations; pipe diameter: 15-1420 mm
More about the project
2013-2016 Oil and gas transmission system from Yarudeyskoye field / NOVATEK Yargeo General contract for construction of a 43.2 km long section of an oil pipeline; pipe diameter: 377 mm (project ‘Section 107.4–150.6 km of the Yarudeyskoye field – Purpe pump station oil pipeline’); construction of a 42 km long section of a gas pipeline; pipe diameter: 420 mm (project ‘Section 107–149 km of the Yarudeyskoye field – Nadymskaya compressor station gas pipeline’); underwater passages over the Kheygiyakha river; all related infrastructure
More about the project
2010-2012 ESPO-2 oil pipeline / Transneft Stroynovatsiya Assembly and welding works on sections with a total length of 15 km; pipe diameter: 1067 mm; wall thickness: 14 mm
More about the project
2010-2012 ESPO-2 oil pipeline / Transneft MRTS Full scope of works on multiple sections with a total length of 11 km, including the subsea tunnel via Amur River; pipe diameter: 1020 mm; wall thickness: 14 mm
More about the project
2012-2015 Bovanenkovo - Ukhta gas pipeline (second stage) / Gazprom Yamalgazinvest General contract for construction of sections with a total length of 249 km including underwater crossing Pechora, Big Synya and White rivers, and related infrastructure; pipe diameter: 1420 mm; wall thickness: 22.7-33 mm
More about the project
2010-2012 ESPO-2 oil pipeline / Transneft APMK-23 Assembly and welding works on sections with a total length of 67 km; pipe diameter: 1067 mm; wall thickness: 12 mm
2009-2011 BPS-2 / Transneft Neftegazstroy, Tatnefteprovodstroy, SMU Truboprovodstroy Assembly and welding works on sections with a total length of 30 km; pipe diameter: 1020 mm; wall thickness: 11 mm
More about the project
2009-2010 Bovanenkovo - Ukhta gas pipeline / Gazprom Centrgaz-truboprovodstroy OJSC, Stroyinvest Komi CJSC Assembly and welding works on sections with a total length of 7,6 km; pipe diameter – 1420 mm; wall thickness – 27 mm
More about the project
2009 Middle Asia - Center gas pipeline (Turkmen section) / GK Turkmengaz OJSC Stroytransgaz Assembly and welding works on sections with a total length of 19.3 km; pipe diameter: 1420 mm; wall thickness: 15.7 mm
2008 Middle Asia - Center gas pipeline (Uzbek section) / Uzbekneftegaz petrochemical complex Zeromax GmbH Assembly and welding works on sections with a total length of 16 km; pipe diameter: 1420 mm; wall thickness: 15.7 mm
2008 Uzbekistan - China gas pipeline / Uzbekneftegaz petrochemical complex Zeromax GmbH Assembly and welding works on sections with a total length of 52 km; pipe diameter: 1067 mm; wall thickness: 19 mm
2007-2009 ESPO-1 oil pipeline / Transneft KSTG-Vostok, OJSC Stroytransgaz, Omskneftegazspetsstroy, etc. Assembly and welding works on sections with a total length of 34.8 km; pipe diameter: 1220 mm; wall thickness: 19-24 mm
More about the project